What this is, and why we propose it

A first step towards a buyer-first intelligence service for hydrogen and e-fuel projects in the North Adriatic.

What this is

A small prototype built only from public data. It lists the industrial installations in Slovenia, Croatia and Friuli Venezia Giulia that already report CO₂ under the EU ETS, estimates how much hydrogen each could use, and adds a layer for synthetic aviation fuel (e-SAF) based on regional airport traffic. Everything is traceable to a public source and every assumption is shown on the page.

It is a sketch, not a finished product. The sector shares and fuel figures are assumptions that need calibration with industry experts, and the page has no live signals yet.

Why start from buyers, not investors

Investors follow offtake

A hydrogen or e-fuel plant is financed when someone credibly agrees to buy its output. A clear, ranked list of likely buyers is therefore the strongest starting point for an investor conversation, and it also tells you which investors would care.

A list of investors is not enough

Lists of decision-makers and press releases are visible to everyone and say little about timing. What matters is who needs the product, how much, and at what price it starts to work.

The price claim needs evidence

Any pitch built on a future price parity will be asked what has to be true for it. A live model with the gas price, the carbon price and the delivered hydrogen price as inputs answers this, and it can double as the data room.

Relationships plus data

Strong personal networks already open doors. Data shows which doors are worth opening and why now, so existing relationships are used on the right targets.

What a service could look like

Why fuel comes first

EU rules require fuel suppliers to blend growing shares of synthetic aviation fuel, which creates a regulated demand for hydrogen and captured CO₂. That makes it the clearest buyer story, so the fuel page leads. The hydrogen page covers industrial users, and industrial CO₂ sources double as candidate CO₂ suppliers for e-fuel plants. The fuel market is EU-wide, so regional airport figures show the local share, not the whole opportunity.

Limits to keep in mind

Proposed next steps

  1. Calibrate the sector shares with an industry expert and fix plant locations.
  2. Wire two or three signal sources and run them for a month.
  3. Build the price model with the project's own cost assumptions.
  4. Decide together whether the weekly brief is worth continuing.

Source code and data: github.com/MaxSemenchuk/north-adriatic-h2-demand-map