Hydrogen demand: industry

Which industrial installations in the North Adriatic could use hydrogen, and how much. Prototype v0.3, built only from public data (EU ETS verified emissions 2025). Estimates rest on stated assumptions and are not validated. View on GitHub

Price check

Break-even = gas energy cost + avoided CO₂ cost per kg H₂ (gas basis, LHV 33.3 kWh/kg, 6.7 kg CO₂ avoided/kg H₂). Ignores burner/retrofit capex and grid/transport fees, so real break-even is lower.

Top buyers by potential H₂ demand

Installations

Installation / holderSectorWhereCO₂ 2025, ktΔ vs 2023H₂ potential, kt/yr

How the estimate works

Source code and data on GitHub

Sources: European Commission, Union Registry verified emissions 2025 (extract 1 Apr 2026) and list of operators; Eurostat, table avia_paoa (passengers by reporting airport).

Next: trigger signals (not wired yet)